Hello everyone - after a long absence from VDJ, I'm now using VDJ again.
Question:
Track 1 is running in deck 1, if I now load and start a new track in deck B, it is ALWAYS automatically synchronized to deck 1. I don't want this, I want the synchronization to ONLY be triggered by pressing the sync button - what am I doing wrong?
All automatic functions in the menu are switched off.
Question:
Track 1 is running in deck 1, if I now load and start a new track in deck B, it is ALWAYS automatically synchronized to deck 1. I don't want this, I want the synchronization to ONLY be triggered by pressing the sync button - what am I doing wrong?
All automatic functions in the menu are switched off.
Posted Sun 24 Nov 24 @ 2:14 pm
After an new fresh installation everything works like it should
Posted Sun 24 Nov 24 @ 6:35 pm